Spengers Fish Grotto
General Contractor:
SSW Construction
Scope:
After a tragic fire that destroyed the original building, Spengers Fish Grotto underwent an extensive renovation. JS Concrete Co was contracted and completed the following scopes:
• Demolish existing concrete slabs and footings
• Excavate, form and pour new grade beams
• Form and pour topping slab
• Install 30 ft long x 18ft high CMU block wall
• Form and pour new sidewalk
Berkeley, CA